Download Envision Project Training Guide - 1.0 PDF

TitleEnvision Project Training Guide - 1.0
TagsComputer Network Cable Electrical Connector Port (Computer Networking) Communications Protocols
File Size5.7 MB
Total Pages159
Table of Contents
                            About Philips Dynalite
About this course
Topic 1: Installation
	Topic Overview
	Learning outcomes
	Physical Installation
		Connectivity and cabling
		Wiring diagram
		Recommended DyNet Colour Coding for CAT5 Cable
		RJ12 Socket Connections
		Load Controllers
			Wall Mounted Controllers
			Din Rail Mounted Controllers
		Control panels
		Network power supply
		Network bridges
		How the system works
		Default Presets
		Commissioning process - flow chart
Topic 2: Connecting to the network
	Topic Overview
	Learning outcomes
	PC Node DTK622 and DMNG-USB-NA
		Connecting to the network
	Connection Properties
	Connection Status
	About Trunk Connections
	About Spur Connections
	Connecting to the system
Topic 3: EnvisionProject Navigation
	Topic Overview
	Learning outcomes
	Start Job Selector
	Screen Navigation
		Main screen
	Main Editor
		Menu bar Icons
		Areas, Channels and Folders
		/Network View tab
			View
			Menu bar Icons
	Main Editor Properties
		Common Device Properties – Network View
		Load Controller Properties – Network View
		Sensor Properties – Network View
		Bridge Properties – Network View
		Physical Channel Properties – Logical view
	Logical Properties
		Common Properties – Logical view
		Area Properties – Logical view
		Preset Properties – Logical view
	Monitor Windows
		Application Log
			Features
		Command monitor
			Features
		Network Log
			Features
	Docking
	Menus and Toolbars
	General features
	Loading, searching and creating devices
		Loading a device
		Searching For Devices
		Create a Device
			Creating a device:
			Features
	Box Number Arbitration
	Factory Setting Devices
Topic 4: Wizards
	Topic Overview
	Learning outcomes
	New Job Wizard
		Creating a project using the New Job Wizard
		Sensor Configuration Wizard
		Bridge Configuration Wizard
			Translation Mode
			Pass All
Topic 5: The Commissioning Assistant
	Topic Overview
	Learning outcomes
	About the Commissioning Assistant
	/
	1. Create Job
	2. Define Job Details
	3. Connect to the Dynalite Network
	4. Define Logical Information
	5. Add Load Controller Devices
	6. Assign Physical Channels
	7. Add User Interface Devices
	8. Add Sensor Devices
	9. Create Tasks
	10. Create Events
	11. Define Logical Presets
	12. Save Data to Devices
Topic 6: Configuring Load Controllers
	Topic Overview
	Learning outcomes
	The floor plan and equipment list
		Equipment list
	Flashing
	Load Schedule
	Manual Load Controller Configuration
	Logical Load Controller Configuration
Topic 7: Configuring Panels
	Topic Overview
	Learning outcomes
	Panel settings
		Device Properties Tab
		Assigning a panel to an Area
		Changing Panel box numbers
		Enable Area zero messaging
		Panel Views
	Configuring Panels
		Configuring Presets
		Configuring one touch
Topic 8: Configuring sensors
	Topic Overview
	Learning outcomes
	About the universal sensor
	Occupancy detection
		Occupancy detection example
		Occupied Preset action
		Grace Preset action
		Vacant Preset action
	Configuring occupancy detection
	Configuring light level sensing
		Open loop light level compensation example
			Start up delay
		Sensor Calibration
Topic 9: Configuring other devices
	Topic Overview
	Learning outcomes
	DTC602
		Setting the time
	DNG100BT
		Wireless DyNet Network Connection
	DDMIDC8
		Configuring dry contact inputs to send Preset messages
		Configuring analogue inputs to trigger tasks
Topic 10: Sequential Tasking
	Topic overview
	Learning outcomes
	About tasking
	Task editor
		Opening the EnvisionProject Task Editor
		Saving your task
	Running a task from a panel
	My First task
	Commenting code
	Task constants
		Sequential task applications
	Goodnight task
	Channel level messaging
	Night mode for bathroom task
		Night mode task for panel
		Preset Offsets
			Sending Preset offset from the clock
	New Vector task
		Null
	Unconditional loop task
	Control Tasks
	Running a task from another device
	Panic task
		Panic Mode
		Unpanic mode
		Enabling buttons in Panic mode
Topic 11: Conditional Tasking
	Topic overview
	Learning outcomes
	DyNet messages
	Conditional task applications
		Memory Map
		Terminology
	Conditional welcome home task
		Configuring the time clock
	Extractor fan run on task
		Extractor fan run on task version 2
		Button LED control
		Conditional Loops
	DyNet Packet Sender
	Find & Replace
	Tools > Settings
		User Settings
		System Settings
		Job Settings
	Trouble shooting
		Checking for offline devices
		Network Log
		Application Log
		Command Monitor
	Appendix
		Glossary of terms
	Hot keys
	DLight 2 to EnvisionProject Translation
                        
Document Text Contents
Page 1

Training
Guide Book

Version 1.0.0


















Author: Sam Hentunen. Contents subject to change without notice.

© 2010 Dynalite Intelligent Light Pty Ltd (ABN 97 095 929 829). All permissions reserved. Dynalite, Dimtek, DyNet and DLight
and associated logos are the registered trademarks of Dynalite Intelligent Light Pty Ltd.

Not to be reproduced without permission.

Page 2

2

Page 79

Topic 6: Configuring Load Controllers

79

TOPIC 6: CONFIGURING LOAD CONTROLLERS

Topic Overview

The fundamental principle of operation of a Dynalite control network is cantered on grouping
related circuits into areas and then recalling Preset scenes for those areas. This method of
operation is entirely dependent on the load controllers being commissioned correctly.

Once this vital work is completed the project has a solid foundation on which any number of
operational features can be applied. This section is focused on getting the logical configuration of
the load controllers correct.



Learning outcomes

By the end of this topic you will be able to:


• Identify physical Channels in a Philips Dynalite project.


• Configure a load controller using EnvisionProject.



The floor plan and equipment list

Some kind of floor plan is needed to enable the programmer to break up the site into controllable
chunks called areas. This plan would ideally be taken from the engineering drawings but could be
as simple as a sketch on a pad.



Fig 84 – Philips Dynalite training case floor plan

Page 80

Topic 6: Configuring Load Controllers

80

Equipment list

The programmer should be issued with a list of supplied products for a project before they arrive at
site. This is the only way to ensure that each device on the network is accounted for.

The Training case V2 contains:


• 2 x DDBC1200 – Ballast Controllers.


• 1 x DLP950 – 5 button panel.


• 1 x DPN881D – 8 button panel with key switch.


• 1 x DPWE – 5 button panel.


• 1 x DRP96K –6 button panel.


• 1 x DUS704C 0r 1 x DUS804C –Universal Sensor.


The Mini Training Case contains:


• 2 x DDBC1200 – Ballast Controllers.


• 2 x DR2P98M – 8 button panel.



Flashing

Flashing is used to identify the location of circuits and devices in a project, this information is then
used to determine logical Area and Channel assignments to create a load schedule for
commissioning.

There are 2 levels of Flashing, by device or by individual Channel.

Flashing a device is used to find its physical location, additionally Flashing a load controller enables
the identification of all Channel locations simultaneously, in large projects, this allows for the
general location of the circuits for a load controller to be quickly identified.

Flashing by Channel is used to identify the specific physical locations of Channels for the load
controller, a load schedule maybe created using this information.

EnvisionProject provides support for flashing the following items:


1. Logical Areas – Alternatively sends fade Area (all Channels) 0% and 100% messages. Areas
can be flashed from the Logical view.


2. Logical Channels – Alternatively sends set logical Channel level 0% and 100% messages.
Logical Channels can be flashed from the Logical view or the logical Preset editor.


3. Physical Channels – Alternatively sends set physical Channel level 0% and 100% messages.

Physical Channels can be flashed from the Logical view, the unassigned Channels view or
the physical Preset editor.


4. Load Controllers – Alternatively sends set all physical Channels level 0% and 100%

messages. Load controllers can be flashed from the Network view, the unassigned Channels
view or the devices references view.

Page 158

Hot Keys

158

Hot keys

Alt + 1 Logical view

Alt + 2 Network view

Alt + 5 Commissioning Assistant

Alt + 6 Application log

Alt + 7 Network log

Alt + 8 Command monitor

Alt + A Change Area

Alt + B Change box number

Alt + C Channel Editor tab (When a load controller is highlighted in the Network view)

Alt + E Edit Memory

Alt + F Factory set

Alt + W Open wizard

Alt + T Open task editor

Alt + P Buttons tabs (Panels) Preset editor (Load controller)

Alt + X Export to file

Alt + R Set Realtime Clock...

Alt + F4 Exit

Ctrl+1-8 Send a Preset message

Ctrl + A Insert new Area

Ctrl + C Copy

Ctrl + H Insert new Logical Channel

Ctrl + E Insert new folder

Ctrl + F Find

Ctrl + D Add new device

Ctrl + L Load devices from network

Ctrl + I Import devices from file

Ctrl + R Insert Preset

Ctrl +I Open file

Ctrl + N New

Ctrl + O Open

Page 159

Hot Keys

159


Ctrl + L Open Load Devices from Network dialog

Ctrl + V Paste

Ctrl + Y Redo

Ctrl + X Cut

Ctrl + F10 Open DyNet Sender

F2 Rename

F3 Find Next

Shift +F3 Find Previous

F4 Request device information

F5 Send Reset

F6 Send Sign on

F7 Flash Device\Channel

F8 Toggle Network/Logical view

F11 Load data from device

F12 Store data to device

Home Top of Network/Logical view

End Bottom of Network/Logical view


DLight 2 to EnvisionProject Translation

EnvisionProject DLight 2

Connection Settings Comms

Main Editor Properties Edit dialog / Configure dialog

Main Editor System Supervisor Window

Network View Physical View

Network Log Monitor Window

Search Devices Config Search List

Save to Device Dump

Task editor Crimson Editor

Similer Documents